Aluminum Ceiling Panel Installation: Key Steps for Beginners

30/04/2025 | Hawkrown

Contact Us

Numerous individuals introduce suspended ceilings when beautifying indoor spaces. Among the different sorts of indoor suspended ceilings, aluminum gusset plate ceilings are favored for their dazzling appearance and fabulous dampness resistance and cover properties. In this manner, they are frequently introduced in kitchens and lavatories. So, what are the steps for introducing aluminum gusset plate ceilings? This article will present them.

Steps for Introducing Aluminum Gusset Plate Ceilings

1. Arrangement

When introducing aluminum gusset plates, plan aluminum amalgam boards, main/secondary bottom, holders, affect penetrate, plumb weave, non-toothed saw, and other related materials.

2. Checking the Base Line

Once the establishment materials for the suspended ceiling are prepared, discover the plan stature and center point of the room concurring to the level line of the remodel floor, and after that along the complete ceiling at the stamped stature, draw the positions for the bottom based on the center point of the room.

3. Introducing the Most Bottom

After checking the stature line and the positions of the keel, determine the height of the holders and introduce the most bottom. When introducing, the most bottom must be settled to the ceiling utilizing extension screws.

4. Introducing the Most Bottom

The most bottom for aluminum gusset plate ceilings is fundamentally made of C38 light steel bottom, with a dividing of no more than 1200mm. Amid establishment, interface it with the coordinating holders and check in case it is secure.

5. Introducing Border Bottom

Agreeing to the tallness of the ceiling, introduce 25*25mm border keels around the dividers, at that point settle them in put with cement nails, guaranteeing a dividing of no more than 300mm between the nails.

6. Introducing Auxiliary Bottom

The auxiliary bottom is regularly hung from the most bottom utilizing holders. In case the auxiliary bottom has to be lengthened with multiple pieces, utilize a auxiliary bottom connector. Whereas hanging the auxiliary bottom, fix and secure it.

7. Introducing Metal Plates

After all the keels are introduced, set a reference line along the heading of the vertical auxiliary bottom, and start establishment from that reference line to both sides. When introducing, handle the aluminum gusset plates tenderly, guaranteeing they fit cozily onto the keels.

8. Cleaning

Once the establishment of the aluminum gusset plate ceiling is total, wipe the surface panels with a cloth to remove any stains.

In rundown:these are the steps for introducing aluminum gusset plate ceilings. We trust this data makes a difference you amid the establishment prepare and permits you to realize a more exquisite ceiling space.